Understanding & Implementing ISO 9001:2015
- Sertifikasi Internal
Tanggal | Nama | Durasi | Harga | Lokasi | Checkout | Status | Start |
---|---|---|---|---|---|---|---|
6-11 Jan | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 1/6/23 | |
11-13 Jan | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 1/11/23 | |
16-28 Jan | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 1/16/23 | |
23-4 Jan | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 1/23/23 | |
30-11 Jan | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 1/30/23 | |
In-House | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | ||
16-20 Jan | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 1/16/23 | |
23-27 Jan | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 1/23/23 | |
30-3 Jan | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 1/30/23 | |
16-19 Jan | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/16/23 | |
16-19 Jan | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/16/23 | |
16-19 Jan | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/16/23 | |
16 Jan-9 Feb | Ahli K3 Pesawat Angkat Angkut (PAA) - KEMNAKER | 25 Hari | 28.000.000 | Hybrid | Daftar | 1/16/23 | |
16-21 Jan | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 1/16/23 | |
16-19 Jan | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 1/16/23 | |
16-19 Jan | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/16/23 | |
23-26 Jan | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/23/23 | |
30-3 Jan | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/30/23 | |
23-26 Jan | Ahli K3 Muda (Operator K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/23/23 | |
30-3 Jan | Ahli K3 Muda (Operator K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/30/23 | |
16-19 Jan | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 1/16/23 | |
16-19 Jan | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 1/16/23 | |
16-21 Jan | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 1/16/23 | |
17-20 Jan | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/17/23 | |
17-20 Jan | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 1/17/23 | |
17-20 Jan | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 1/17/23 | |
17-18 Jan | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 1/17/23 | |
17-18 Jan | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 1/17/23 | |
17-18 Jan | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 1/17/23 | |
17-19 Jan | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 1/17/23 | |
18-21 Jan | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/18/23 | |
18-22 Jan | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 1/18/23 | |
18-21 Jan | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 1/18/23 | |
18-20 Jan | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 1/18/23 | |
18-21 Jan | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/18/23 | |
18-21 Jan | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/18/23 | |
18-20 Jan | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 1/18/23 | |
18-20 Jan | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 1/18/23 | |
19-21 Jan | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 1/19/23 | |
19-20 Jan | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 1/19/23 | |
19-20 Jan | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 1/19/23 | |
19-20 Jan | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 1/19/23 | |
19-20 Jan | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 1/19/23 | |
20-23 Jan | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 1/20/23 | |
20-21 Jan | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 1/20/23 | |
23-27 Jan | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 1/23/23 | |
23-27 Jan | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 1/23/23 | |
23-27 Jan | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 1/23/23 | |
23-27 Jan | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 1/23/23 | |
23-26 Jan | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/23/23 | |
23 Jan-8 Feb | Ahli K3 Listrik - KEMNAKER | 17 Hari | 14.500.000 | Hybrid | Daftar | 1/23/23 | |
23-25 Jan | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 1/23/23 | |
23-28 Jan | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 1/23/23 | |
23-26 Jan | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 1/23/23 | |
23-26 Jan | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 1/23/23 | |
23-26 Jan | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 1/23/23 | |
23-26 Jan | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/23/23 | |
23-27 Jan | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 1/23/23 | |
23-28 Jan | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 1/23/23 | |
23-25 Jan | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 1/23/23 | |
23-25 Jan | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 1/23/23 | |
23-25 Jan | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 1/23/23 | |
23-28 Jan | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 1/23/23 | |
23-27 Jan | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 1/23/23 | |
23-27 Jan | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 1/23/23 | |
23-27 Jan | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/23/23 | |
23-27 Jan | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 1/23/23 | |
23-27 Jan | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 1/23/23 | |
23-25 Jan | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 1/23/23 | |
23-25 Jan | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 1/23/23 | |
23-26 Jan | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 1/23/23 | |
23-28 Jan | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 1/23/23 | |
23-28 Jan | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 1/23/23 | |
23-28 Jan | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 1/23/23 | |
24-27 Jan | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/24/23 | |
24-27 Jan | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/24/23 | |
24-27 Jan | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/24/23 | |
24-27 Jan | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 1/24/23 | |
24-27 Jan | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 1/24/23 | |
24-27 Jan | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 1/24/23 | |
24-27 Jan | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 1/24/23 | |
24-27 Jan | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 1/24/23 | |
24-27 Jan | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 1/24/23 | |
24-27 Jan | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/24/23 | |
24-26 Jan | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 1/24/23 | |
24-26 Jan | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 1/24/23 | |
24-26 Jan | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 1/24/23 | |
24-25 Jan | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 1/24/23 | |
24-25 Jan | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 1/24/23 | |
25-28 Jan | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/25/23 | |
25-28 Jan | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/25/23 | |
25-28 Jan | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 1/25/23 | |
25-28 Jan | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/25/23 | |
25-28 Jan | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/25/23 | |
25-28 Jan | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 1/25/23 | |
25-28 Jan | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 1/25/23 | |
25-28 Jan | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/25/23 | |
25-30 Jan | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 1/25/23 | |
25-25 Jan | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 1/25/23 | |
26-30 Jan | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 1/26/23 | |
26-27 Jan | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 1/26/23 | |
26-27 Jan | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 1/26/23 | |
30 Jan-2 Feb | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/30/23 | |
30 Jan-4 Feb | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 1/30/23 | |
30 Jan-4 Feb | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 1/30/23 | |
30 Jan-4 Feb | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 1/30/23 | |
30 Jan-2 Feb | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/30/23 | |
30 Jan-2 Feb | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 1/30/23 | |
30 Jan-4 Feb | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 1/30/23 | |
30 Jan-2 Feb | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-3 Feb | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-3 Feb | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-3 Feb | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-3 Feb | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 1/30/23 | |
30 Jan-2 Feb | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 1/30/23 | |
30 Jan-4 Feb | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 1/30/23 | |
30-31 Jan | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 1/30/23 | |
31-31 Jan | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 1/31/23 | |
1-12 Feb | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 2/1/23 | |
6-18 Feb | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 2/6/23 | |
13-25 Feb | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 2/13/23 | |
20-4 Feb | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 2/20/23 | |
1-5 Feb | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/1/23 | |
1-3 Feb | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 2/1/23 | |
1-4 Feb | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 2/1/23 | |
1-4 Feb | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 2/1/23 | |
6-9 Feb | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/6/23 | |
6-9 Feb | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/6/23 | |
6-9 Feb | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/6/23 | |
6-11 Feb | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 2/6/23 | |
6-9 Feb | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 2/6/23 | |
6-9 Feb | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 2/6/23 | |
6-9 Feb | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 2/6/23 | |
6-11 Feb | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 2/6/23 | |
6-11 Feb | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 2/6/23 | |
7-10 Feb | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/7/23 | |
7-10 Feb | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/7/23 | |
7-10 Feb | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/7/23 | |
8-11 Feb | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/8/23 | |
12-16 Feb | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 2/12/23 | |
12-16 Feb | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 2/12/23 | |
12-16 Feb | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 2/12/23 | |
13-18 Feb | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 2/13/23 | |
13-16 Feb | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/13/23 | |
20-23 Feb | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/20/23 | |
27-2 Feb | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/27/23 | |
13-16 Feb | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 2/13/23 | |
13-15 Feb | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 2/13/23 | |
13-15 Feb | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 2/13/23 | |
13-17 Feb | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 2/13/23 | |
13-17 Feb | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 2/13/23 | |
13-17 Feb | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/13/23 | |
13-16 Feb | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 2/13/23 | |
13-18 Feb | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 2/13/23 | |
13-14 Feb | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 2/13/23 | |
13-14 Feb | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 2/13/23 | |
14-17 Feb | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/14/23 | |
14-17 Feb | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/14/23 | |
14-17 Feb | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/14/23 | |
14-17 Feb | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 2/14/23 | |
14-17 Feb | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 2/14/23 | |
14-17 Feb | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 2/14/23 | |
14-17 Feb | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 2/14/23 | |
14-15 Feb | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 2/14/23 | |
14-16 Feb | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 2/14/23 | |
15-17 Feb | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 2/15/23 | |
15-17 Feb | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 2/15/23 | |
15-17 Feb | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 2/15/23 | |
15-16 Feb | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 2/15/23 | |
15-16 Feb | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 2/15/23 | |
16-18 Feb | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 2/16/23 | |
16-17 Feb | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 2/16/23 | |
16-17 Feb | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 2/16/23 | |
19-24 Feb | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 2/19/23 | |
20-23 Feb | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/20/23 | |
20-24 Feb | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 2/20/23 | |
20-23 Feb | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/20/23 | |
20-25 Feb | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 2/20/23 | |
20-25 Feb | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 2/20/23 | |
20-25 Feb | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 2/20/23 | |
20-22 Feb | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 2/20/23 | |
20-25 Feb | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 2/20/23 | |
20-23 Feb | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/20/23 | |
20-24 Feb | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 2/20/23 | |
20-23 Feb | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 2/20/23 | |
20-23 Feb | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 2/20/23 | |
20-23 Feb | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/20/23 | |
20-22 Feb | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 2/20/23 | |
20-22 Feb | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 2/20/23 | |
20-22 Feb | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 2/20/23 | |
20-25 Feb | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/20/23 | |
20-24 Feb | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 2/20/23 | |
20-24 Feb | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 2/20/23 | |
20-23 Feb | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 2/20/23 | |
20-25 Feb | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 2/20/23 | |
20-25 Feb | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 2/20/23 | |
20-20 Feb | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 2/20/23 | |
21-24 Feb | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/21/23 | |
21-24 Feb | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 2/21/23 | |
21-22 Feb | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 2/21/23 | |
21-22 Feb | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 2/21/23 | |
22-24 Feb | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 2/22/23 | |
22-25 Feb | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 2/22/23 | |
22-25 Feb | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 2/22/23 | |
22-25 Feb | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 2/22/23 | |
22-25 Feb | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 2/22/23 | |
22-25 Feb | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 2/22/23 | |
22-25 Feb | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/22/23 | |
22-23 Feb | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 2/22/23 | |
23-27 Feb | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 2/23/23 | |
23-26 Feb | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/23/23 | |
23-26 Feb | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/23/23 | |
23-26 Feb | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/23/23 | |
23-27 Feb | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 2/23/23 | |
23-28 Feb | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 2/23/23 | |
23-24 Feb | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 2/23/23 | |
23-24 Feb | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 2/23/23 | |
27 Feb-4 Mar | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 2/27/23 | |
27 Feb-2 Mar | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 2/27/23 | |
27 Feb-2 Mar | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 2/27/23 | |
27 Feb-2 Mar | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 2/27/23 | |
27 Feb-2 Mar | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/27/23 | |
27 Feb-2 Mar | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 2/27/23 | |
27 Feb-2 Mar | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/27/23 | |
27 Feb-2 Mar | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 2/27/23 | |
27 Feb-2 Mar | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 2/27/23 | |
27 Feb-3 Mar | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 2/27/23 | |
27 Feb-3 Mar | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 2/27/23 | |
27 Feb-3 Mar | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 2/27/23 | |
27 Feb-3 Mar | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 2/27/23 | |
27 Feb-1 Mar | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 2/27/23 | |
27 Feb-1 Mar | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 2/27/23 | |
27-28 Feb | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 2/27/23 | |
27-27 Feb | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 2/27/23 | |
1-3 Mar | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 3/1/23 | |
1-4 Mar | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 3/1/23 | |
1-4 Mar | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 3/1/23 | |
1-4 Mar | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/1/23 | |
1-2 Mar | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 3/1/23 | |
4-9 Mar | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 3/4/23 | |
6-17 Mar | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 3/6/23 | |
13-25 Mar | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 3/13/23 | |
20-1 Mar | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 3/20/23 | |
6-10 Mar | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/6/23 | |
6-9 Mar | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/6/23 | |
6-9 Mar | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/6/23 | |
6-9 Mar | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/6/23 | |
6-9 Mar | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/6/23 | |
6-9 Mar | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 3/6/23 | |
6-9 Mar | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/6/23 | |
6-8 Mar | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 3/6/23 | |
6-8 Mar | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 3/6/23 | |
6-9 Mar | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/6/23 | |
6-11 Mar | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 3/6/23 | |
7-10 Mar | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 3/7/23 | |
7-10 Mar | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 3/7/23 | |
7-10 Mar | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 3/7/23 | |
7-10 Mar | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 3/7/23 | |
7-10 Mar | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 3/7/23 | |
8-10 Mar | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 3/8/23 | |
8-9 Mar | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 3/8/23 | |
8-10 Mar | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 3/8/23 | |
9-12 Mar | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/9/23 | |
10-13 Mar | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/10/23 | |
10-13 Mar | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/10/23 | |
10-13 Mar | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 3/10/23 | |
10-13 Mar | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 3/10/23 | |
10-14 Mar | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 3/10/23 | |
10-14 Mar | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 3/10/23 | |
10-12 Mar | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 3/10/23 | |
10-11 Mar | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 3/10/23 | |
10-11 Mar | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 3/10/23 | |
12-16 Mar | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 3/12/23 | |
12-16 Mar | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 3/12/23 | |
12-16 Mar | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 3/12/23 | |
12-15 Mar | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 3/12/23 | |
12-15 Mar | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 3/12/23 | |
12-15 Mar | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 3/12/23 | |
12-15 Mar | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 3/12/23 | |
12-15 Mar | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 3/12/23 | |
12-15 Mar | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 3/12/23 | |
13 Mar-6 Apr | Ahli K3 Pesawat Angkat Angkut (PAA) - KEMNAKER | 25 Hari | 28.000.000 | Hybrid | Daftar | 3/13/23 | |
13-16 Mar | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 3/13/23 | |
13-16 Mar | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 3/13/23 | |
13-15 Mar | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 3/13/23 | |
13-15 Mar | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 3/13/23 | |
13-15 Mar | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 3/13/23 | |
13-18 Mar | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 3/13/23 | |
13-16 Mar | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 3/13/23 | |
13-18 Mar | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 3/13/23 | |
13-18 Mar | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 3/13/23 | |
14-17 Mar | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/14/23 | |
14-17 Mar | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/14/23 | |
21-24 Mar | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/21/23 | |
28-31 Mar | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/28/23 | |
14-17 Mar | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 3/14/23 | |
14-17 Mar | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 3/14/23 | |
15-18 Mar | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/15/23 | |
15-19 Mar | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 3/15/23 | |
15-18 Mar | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/15/23 | |
15-18 Mar | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 3/15/23 | |
15-18 Mar | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/15/23 | |
15-18 Mar | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/15/23 | |
15-18 Mar | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/15/23 | |
15-16 Mar | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 3/15/23 | |
15-16 Mar | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 3/15/23 | |
16-20 Mar | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 3/16/23 | |
16-17 Mar | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 3/16/23 | |
17-18 Mar | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 3/17/23 | |
17-18 Mar | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 3/17/23 | |
19-24 Mar | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 3/19/23 | |
19-22 Mar | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 3/19/23 | |
19-24 Mar | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 3/19/23 | |
20-24 Mar | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 3/20/23 | |
20 Mar-5 Apr | Ahli K3 Listrik - KEMNAKER | 17 Hari | 14.500.000 | Hybrid | Daftar | 3/20/23 | |
20-22 Mar | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 3/20/23 | |
20-25 Mar | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 3/20/23 | |
20-23 Mar | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/20/23 | |
20-25 Mar | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 3/20/23 | |
20-25 Mar | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 3/20/23 | |
20-21 Mar | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 3/20/23 | |
20-21 Mar | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 3/20/23 | |
20-20 Mar | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 3/20/23 | |
21-21 Mar | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 3/21/23 | |
22-23 Mar | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 3/22/23 | |
22-23 Mar | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 3/22/23 | |
23-26 Mar | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/23/23 | |
23-26 Mar | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/23/23 | |
23-26 Mar | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/23/23 | |
23-26 Mar | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/23/23 | |
23-26 Mar | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/23/23 | |
23-27 Mar | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 3/23/23 | |
23-28 Mar | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 3/23/23 | |
23-25 Mar | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 3/23/23 | |
23-25 Mar | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 3/23/23 | |
23-25 Mar | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 3/23/23 | |
23-25 Mar | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 3/23/23 | |
23-25 Mar | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 3/23/23 | |
24-27 Mar | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 3/24/23 | |
27-30 Mar | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 3/27/23 | |
27 Mar-1 Apr | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 3/27/23 | |
27 Mar-1 Apr | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 3/27/23 | |
27 Mar-1 Apr | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 3/27/23 | |
27-30 Mar | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 3/27/23 | |
27-30 Mar | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 3/27/23 | |
27-30 Mar | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 3/27/23 | |
27-30 Mar | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 3/27/23 | |
27-31 Mar | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 3/27/23 | |
27-31 Mar | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 3/27/23 | |
27-31 Mar | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 3/27/23 | |
27-31 Mar | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 3/27/23 | |
27-30 Mar | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 3/27/23 | |
27-31 Mar | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 3/27/23 | |
27-31 Mar | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 3/27/23 | |
27-31 Mar | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 3/27/23 | |
28 Mar-2 Apr | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 3/28/23 | |
28-31 Mar | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 3/28/23 | |
28-31 Mar | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 3/28/23 | |
28-31 Mar | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 3/28/23 | |
3-14 Apr | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-7 Apr | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/3/23 | |
3-6 Apr | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/3/23 | |
3-6 Apr | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/3/23 | |
3-6 Apr | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/3/23 | |
3-6 Apr | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/3/23 | |
3-6 Apr | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 4/3/23 | |
3-6 Apr | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/3/23 | |
3-7 Apr | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-7 Apr | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 4/3/23 | |
3-7 Apr | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 4/3/23 | |
3-7 Apr | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/3/23 | |
3-5 Apr | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 4/3/23 | |
3-5 Apr | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 4/3/23 | |
3-6 Apr | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 4/3/23 | |
3-8 Apr | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 4/3/23 | |
4-5 Apr | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 4/4/23 | |
10-13 Apr | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/10/23 | |
10-14 Apr | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 4/10/23 | |
10-13 Apr | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/10/23 | |
10-14 Apr | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 4/10/23 | |
10-14 Apr | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 4/10/23 | |
10-14 Apr | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 4/10/23 | |
10-15 Apr | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 4/10/23 | |
10-13 Apr | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 4/10/23 | |
10-13 Apr | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 4/10/23 | |
10-13 Apr | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 4/10/23 | |
10-13 Apr | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 4/10/23 | |
10-12 Apr | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 4/10/23 | |
10-12 Apr | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 4/10/23 | |
10-12 Apr | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 4/10/23 | |
10-15 Apr | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 4/10/23 | |
10-14 Apr | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 4/10/23 | |
10-14 Apr | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 4/10/23 | |
10-13 Apr | HAZOPS | 4 hari | 6.000.000 | Online | Daftar | 4/10/23 | |
10-15 Apr | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 4/10/23 | |
10-15 Apr | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 4/10/23 | |
10-15 Apr | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 4/10/23 | |
11-14 Apr | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/11/23 | |
11-14 Apr | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/11/23 | |
11-14 Apr | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/11/23 | |
11-14 Apr | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 4/11/23 | |
11-14 Apr | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/11/23 | |
11-14 Apr | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/11/23 | |
11-14 Apr | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/11/23 | |
11-14 Apr | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 4/11/23 | |
11-14 Apr | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/11/23 | |
12-15 Apr | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/12/23 | |
12-16 Apr | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 4/12/23 | |
12-15 Apr | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 4/12/23 | |
12-15 Apr | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/12/23 | |
12-14 Apr | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 4/12/23 | |
12-15 Apr | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/12/23 | |
12-16 Apr | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 4/12/23 | |
12-16 Apr | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 4/12/23 | |
12-16 Apr | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 4/12/23 | |
12-15 Apr | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 4/12/23 | |
12-12 Apr | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 4/12/23 | |
12-13 Apr | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 4/12/23 | |
13-15 Apr | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 4/13/23 | |
13-17 Apr | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 4/13/23 | |
13-16 Apr | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 4/13/23 | |
13-17 Apr | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 4/13/23 | |
13-18 Apr | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 4/13/23 | |
13-18 Apr | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 4/13/23 | |
13-18 Apr | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 4/13/23 | |
14-17 Apr | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 4/14/23 | |
17-20 Apr | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 4/17/23 | |
17-19 Apr | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 4/17/23 | |
17-19 Apr | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 4/17/23 | |
17-19 Apr | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 4/17/23 | |
17-19 Apr | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 4/17/23 | |
17-19 Apr | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 4/17/23 | |
17-18 Apr | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 4/17/23 | |
17-18 Apr | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 4/17/23 | |
19-20 Apr | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 4/19/23 | |
19-20 Apr | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 4/19/23 | |
25-25 Apr | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 4/25/23 | |
2-5 May | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/2/23 | |
2-5 May | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/2/23 | |
2-5 May | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/2/23 | |
2-4 May | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 5/2/23 | |
2-5 May | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 5/2/23 | |
2-5 May | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 5/2/23 | |
2-5 May | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 5/2/23 | |
2-7 May | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 5/2/23 | |
2-7 May | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 5/2/23 | |
2-3 May | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 5/2/23 | |
6-11 May | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 5/6/23 | |
8-11 May | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 5/8/23 | |
8-11 May | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/8/23 | |
8-11 May | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/8/23 | |
8-9 May | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 5/8/23 | |
9-12 May | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/9/23 | |
9-12 May | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 5/9/23 | |
9-12 May | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/9/23 | |
9-12 May | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 5/9/23 | |
9-12 May | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 5/9/23 | |
9-12 May | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 5/9/23 | |
9-12 May | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 5/9/23 | |
9-12 May | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 5/9/23 | |
9-13 May | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 5/9/23 | |
9-13 May | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 5/9/23 | |
9-13 May | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 5/9/23 | |
9-12 May | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/9/23 | |
9-12 May | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/9/23 | |
9-12 May | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/9/23 | |
10-13 May | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/10/23 | |
10-14 May | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 5/10/23 | |
10-13 May | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/10/23 | |
10-13 May | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 5/10/23 | |
10-12 May | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 5/10/23 | |
11-14 May | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/11/23 | |
11-13 May | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 5/11/23 | |
11-13 May | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 5/11/23 | |
15-26 May | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 5/15/23 | |
15-19 May | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 5/15/23 | |
15-19 May | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 5/15/23 | |
15-19 May | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 5/15/23 | |
15-19 May | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 5/15/23 | |
15-19 May | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 5/15/23 | |
15-18 May | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/15/23 | |
15-18 May | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/15/23 | |
15 May-8 Jun | Ahli K3 Pesawat Angkat Angkut (PAA) - KEMNAKER | 25 Hari | 28.000.000 | Hybrid | Daftar | 5/15/23 | |
15-18 May | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 5/15/23 | |
15-18 May | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 5/15/23 | |
15-18 May | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 5/15/23 | |
15-18 May | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/15/23 | |
15-18 May | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 5/15/23 | |
15-18 May | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 5/15/23 | |
15-18 May | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 5/15/23 | |
15-17 May | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 5/15/23 | |
15-17 May | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 5/15/23 | |
15-17 May | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 5/15/23 | |
15-20 May | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 5/15/23 | |
15-18 May | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/15/23 | |
15-17 May | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 5/15/23 | |
15-17 May | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 5/15/23 | |
15-17 May | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 5/15/23 | |
15-18 May | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 5/15/23 | |
15-20 May | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 5/15/23 | |
16-17 May | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 5/16/23 | |
16-18 May | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 5/16/23 | |
18-20 May | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 5/18/23 | |
18-19 May | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 5/18/23 | |
18-19 May | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 5/18/23 | |
19-22 May | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/19/23 | |
19-24 May | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 5/19/23 | |
19-22 May | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 5/19/23 | |
19-22 May | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/19/23 | |
19-22 May | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/19/23 | |
19-22 May | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/19/23 | |
19-22 May | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/19/23 | |
19-22 May | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/19/23 | |
19-22 May | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/19/23 | |
19-22 May | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/19/23 | |
19-22 May | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/19/23 | |
19-22 May | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/19/23 | |
19-22 May | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 5/19/23 | |
19-22 May | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 5/19/23 | |
19-22 May | HAZOPS | 4 hari | 6.000.000 | Online | Daftar | 5/19/23 | |
19-24 May | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 5/19/23 | |
19-20 May | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 5/19/23 | |
19-20 May | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 5/19/23 | |
20-23 May | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/20/23 | |
20-23 May | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/20/23 | |
20-23 May | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/20/23 | |
21-22 May | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 5/21/23 | |
21-22 May | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 5/21/23 | |
22-25 May | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/22/23 | |
22-25 May | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/22/23 | |
22-27 May | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 5/22/23 | |
22-27 May | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 5/22/23 | |
22-27 May | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 5/22/23 | |
22-25 May | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 5/22/23 | |
22 May-7 Jun | Ahli K3 Listrik - KEMNAKER | 17 Hari | 14.500.000 | Hybrid | Daftar | 5/22/23 | |
22-24 May | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 5/22/23 | |
22-27 May | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 5/22/23 | |
22-25 May | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 5/22/23 | |
22-25 May | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 5/22/23 | |
22-25 May | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/22/23 | |
22-26 May | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-26 May | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 5/22/23 | |
22-26 May | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 5/22/23 | |
22-26 May | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 5/22/23 | |
22-25 May | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/22/23 | |
22-25 May | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/22/23 | |
22-25 May | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/22/23 | |
22-26 May | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 5/22/23 | |
22-26 May | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 5/22/23 | |
22-24 May | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 5/22/23 | |
22-24 May | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 5/22/23 | |
22-25 May | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 5/22/23 | |
22-27 May | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 5/22/23 | |
22-27 May | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 5/22/23 | |
23-24 May | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 5/23/23 | |
23-24 May | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 5/23/23 | |
24-27 May | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/24/23 | |
24-27 May | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/24/23 | |
24-27 May | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 5/24/23 | |
24-27 May | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 5/24/23 | |
24-27 May | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 5/24/23 | |
24-24 May | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 5/24/23 | |
25-29 May | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 5/25/23 | |
25-28 May | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 5/25/23 | |
25-28 May | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 5/25/23 | |
25-28 May | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 5/25/23 | |
25-29 May | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 5/25/23 | |
25-30 May | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 5/25/23 | |
25-26 May | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 5/25/23 | |
25-26 May | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 5/25/23 | |
29 May-3 Jun | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 5/29/23 | |
30-30 May | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 5/30/23 | |
2-6 Jun | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 6/2/23 | |
2-6 Jun | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 6/2/23 | |
2-6 Jun | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 6/2/23 | |
2-5 Jun | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/2/23 | |
2-5 Jun | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/2/23 | |
2-5 Jun | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/2/23 | |
2-3 Jun | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 6/2/23 | |
4-9 Jun | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 6/4/23 | |
5-8 Jun | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/5/23 | |
5-8 Jun | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/5/23 | |
5-8 Jun | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/5/23 | |
5-8 Jun | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/5/23 | |
5-7 Jun | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 6/5/23 | |
5-7 Jun | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 6/5/23 | |
5-7 Jun | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 6/5/23 | |
5-10 Jun | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 6/5/23 | |
5-8 Jun | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 6/5/23 | |
5-10 Jun | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 6/5/23 | |
5-10 Jun | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 6/5/23 | |
5-6 Jun | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 6/5/23 | |
8-11 Jun | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/8/23 | |
8-11 Jun | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/8/23 | |
8-11 Jun | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/8/23 | |
8-11 Jun | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/8/23 | |
8-11 Jun | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/8/23 | |
8-12 Jun | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 6/8/23 | |
8-13 Jun | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 6/8/23 | |
11-16 Jun | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 6/11/23 | |
12-23 Jun | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 6/12/23 | |
12-16 Jun | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 6/12/23 | |
12-16 Jun | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 6/12/23 | |
12-16 Jun | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 6/12/23 | |
12-16 Jun | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 6/12/23 | |
12-15 Jun | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 6/12/23 | |
12-15 Jun | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/12/23 | |
12-15 Jun | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/12/23 | |
12-15 Jun | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/12/23 | |
12-15 Jun | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/12/23 | |
12-15 Jun | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/12/23 | |
12-15 Jun | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 6/12/23 | |
12-15 Jun | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 6/12/23 | |
12-15 Jun | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 6/12/23 | |
13-16 Jun | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 6/13/23 | |
13-16 Jun | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/13/23 | |
13-14 Jun | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 6/13/23 | |
13-15 Jun | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 6/13/23 | |
14-17 Jun | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/14/23 | |
14-19 Jun | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 6/14/23 | |
14-17 Jun | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/14/23 | |
14-16 Jun | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 6/14/23 | |
14-17 Jun | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 6/14/23 | |
14-17 Jun | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 6/14/23 | |
14-19 Jun | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 6/14/23 | |
15-17 Jun | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 6/15/23 | |
15-17 Jun | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 6/15/23 | |
15-16 Jun | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 6/15/23 | |
15-16 Jun | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 6/15/23 | |
19-23 Jun | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 6/19/23 | |
19-24 Jun | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 6/19/23 | |
19-24 Jun | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 6/19/23 | |
19-24 Jun | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 6/19/23 | |
19-22 Jun | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/19/23 | |
19-22 Jun | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 6/19/23 | |
19-22 Jun | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 6/19/23 | |
19-22 Jun | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 6/19/23 | |
19-22 Jun | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/19/23 | |
19-22 Jun | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/19/23 | |
19-23 Jun | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 6/19/23 | |
19-23 Jun | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 6/19/23 | |
19-24 Jun | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 6/19/23 | |
19-24 Jun | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 6/19/23 | |
19-20 Jun | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 6/19/23 | |
19-20 Jun | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 6/19/23 | |
19-24 Jun | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 6/19/23 | |
20-23 Jun | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/20/23 | |
20-23 Jun | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/20/23 | |
20-23 Jun | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 6/20/23 | |
20-21 Jun | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 6/20/23 | |
20-21 Jun | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 6/20/23 | |
21-24 Jun | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/21/23 | |
21-25 Jun | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 6/21/23 | |
21-24 Jun | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 6/21/23 | |
21-24 Jun | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/21/23 | |
21-24 Jun | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 6/21/23 | |
21-25 Jun | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 6/21/23 | |
21-22 Jun | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 6/21/23 | |
21-22 Jun | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 6/21/23 | |
22-25 Jun | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/22/23 | |
22-25 Jun | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/22/23 | |
22-26 Jun | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 6/22/23 | |
22-25 Jun | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 6/22/23 | |
22-25 Jun | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 6/22/23 | |
22-26 Jun | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 6/22/23 | |
22-26 Jun | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 6/22/23 | |
22-26 Jun | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 6/22/23 | |
22-23 Jun | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 6/22/23 | |
22-23 Jun | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 6/22/23 | |
23-26 Jun | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 6/23/23 | |
26-29 Jun | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 6/26/23 | |
26-28 Jun | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 6/26/23 | |
26 Jun-1 Jul | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 6/26/23 | |
26-29 Jun | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 6/26/23 | |
26-28 Jun | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 6/26/23 | |
26-28 Jun | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 6/26/23 | |
26-28 Jun | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 6/26/23 | |
26-28 Jun | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 6/26/23 | |
26-28 Jun | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 6/26/23 | |
26-28 Jun | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 6/26/23 | |
26-28 Jun | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 6/26/23 | |
26-26 Jun | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 6/26/23 | |
30-30 Jun | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 6/30/23 | |
1-1 Jul | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 7/1/23 | |
3-14 Jul | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 7/3/23 | |
3-7 Jul | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/3/23 | |
3-6 Jul | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/3/23 | |
3-6 Jul | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/3/23 | |
3-6 Jul | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/3/23 | |
3-6 Jul | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 7/3/23 | |
3-6 Jul | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/3/23 | |
3-5 Jul | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 7/3/23 | |
3-5 Jul | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 7/3/23 | |
3-5 Jul | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 7/3/23 | |
3-8 Jul | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 7/3/23 | |
3-5 Jul | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 7/3/23 | |
3-5 Jul | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 7/3/23 | |
3-5 Jul | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 7/3/23 | |
3-6 Jul | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 7/3/23 | |
3-8 Jul | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 7/3/23 | |
3-4 Jul | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 7/3/23 | |
4-7 Jul | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 7/4/23 | |
4-7 Jul | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 7/4/23 | |
5-7 Jul | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 7/5/23 | |
7-12 Jul | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 7/7/23 | |
10-14 Jul | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 7/10/23 | |
10-14 Jul | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 7/10/23 | |
10-14 Jul | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 7/10/23 | |
10-15 Jul | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 7/10/23 | |
10-13 Jul | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 7/10/23 | |
10-13 Jul | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 7/10/23 | |
10-15 Jul | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 7/10/23 | |
10-15 Jul | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 7/10/23 | |
11-14 Jul | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/11/23 | |
11-14 Jul | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 7/11/23 | |
11-14 Jul | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 7/11/23 | |
11-12 Jul | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 7/11/23 | |
11-13 Jul | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 7/11/23 | |
12-15 Jul | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/12/23 | |
12-16 Jul | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 7/12/23 | |
12-15 Jul | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/12/23 | |
12-15 Jul | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 7/12/23 | |
12-15 Jul | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/12/23 | |
12-15 Jul | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/12/23 | |
12-15 Jul | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/12/23 | |
13-16 Jul | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/13/23 | |
13-16 Jul | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/13/23 | |
13-17 Jul | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 7/13/23 | |
13-16 Jul | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/13/23 | |
13-16 Jul | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/13/23 | |
13-16 Jul | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/13/23 | |
13-17 Jul | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 7/13/23 | |
13-18 Jul | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 7/13/23 | |
13-15 Jul | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 7/13/23 | |
13-14 Jul | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 7/13/23 | |
13-14 Jul | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 7/13/23 | |
17-21 Jul | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 7/17/23 | |
17 Jul-10 Aug | Ahli K3 Pesawat Angkat Angkut (PAA) - KEMNAKER | 25 Hari | 28.000.000 | Hybrid | Daftar | 7/17/23 | |
17 Jul-2 Aug | Ahli K3 Listrik - KEMNAKER | 17 Hari | 14.500.000 | Hybrid | Daftar | 7/17/23 | |
17-20 Jul | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/17/23 | |
17-20 Jul | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 7/17/23 | |
17-20 Jul | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/17/23 | |
17-20 Jul | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/17/23 | |
17-18 Jul | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 7/17/23 | |
18-19 Jul | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 7/18/23 | |
18-19 Jul | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 7/18/23 | |
20-22 Jul | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 7/20/23 | |
20-23 Jul | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 7/20/23 | |
20-23 Jul | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 7/20/23 | |
20-23 Jul | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 7/20/23 | |
20-23 Jul | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 7/20/23 | |
20-23 Jul | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/20/23 | |
20-23 Jul | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/20/23 | |
20-23 Jul | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 7/20/23 | |
20-25 Jul | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 7/20/23 | |
20-25 Jul | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 7/20/23 | |
20-21 Jul | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 7/20/23 | |
20-21 Jul | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 7/20/23 | |
21-24 Jul | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 7/21/23 | |
21-24 Jul | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 7/21/23 | |
21-24 Jul | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 7/21/23 | |
21-24 Jul | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/21/23 | |
24-27 Jul | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/24/23 | |
24-29 Jul | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 7/24/23 | |
24-29 Jul | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 7/24/23 | |
24-29 Jul | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 7/24/23 | |
24-26 Jul | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 7/24/23 | |
24-29 Jul | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 7/24/23 | |
24-27 Jul | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 7/24/23 | |
24-27 Jul | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 7/24/23 | |
24-27 Jul | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 7/24/23 | |
24-27 Jul | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/24/23 | |
24-26 Jul | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 7/24/23 | |
24-26 Jul | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/24/23 | |
24-28 Jul | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 7/24/23 | |
24-28 Jul | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 7/24/23 | |
24-28 Jul | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/24/23 | |
24-28 Jul | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 7/24/23 | |
24-28 Jul | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 7/24/23 | |
24-26 Jul | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 7/24/23 | |
24-26 Jul | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 7/24/23 | |
24-27 Jul | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 7/24/23 | |
24-29 Jul | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 7/24/23 | |
24-25 Jul | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 7/24/23 | |
24-25 Jul | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 7/24/23 | |
25-28 Jul | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/25/23 | |
25-28 Jul | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/25/23 | |
25-28 Jul | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/25/23 | |
25-28 Jul | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/25/23 | |
25-28 Jul | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 7/25/23 | |
25-29 Jul | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 7/25/23 | |
25-29 Jul | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 7/25/23 | |
25-29 Jul | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 7/25/23 | |
25-29 Jul | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 7/25/23 | |
25-25 Jul | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 7/25/23 | |
26-29 Jul | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/26/23 | |
26-29 Jul | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 7/26/23 | |
26-29 Jul | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 7/26/23 | |
26-29 Jul | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 7/26/23 | |
26-29 Jul | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 7/26/23 | |
26-27 Jul | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 7/26/23 | |
26-27 Jul | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 7/26/23 | |
31 Jul-5 Aug | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 7/31/23 | |
1-4 Aug | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 8/1/23 | |
1-3 Aug | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 8/1/23 | |
1-4 Aug | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 8/1/23 | |
1-4 Aug | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 8/1/23 | |
1-4 Aug | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/1/23 | |
1-2 Aug | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 8/1/23 | |
3-6 Aug | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/3/23 | |
4-9 Aug | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 8/4/23 | |
7-10 Aug | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/7/23 | |
7-10 Aug | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/7/23 | |
7-10 Aug | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/7/23 | |
7-10 Aug | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 8/7/23 | |
7-10 Aug | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 8/7/23 | |
7-11 Aug | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 8/7/23 | |
7-11 Aug | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 8/7/23 | |
7-8 Aug | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 8/7/23 | |
7-8 Aug | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 8/7/23 | |
7-7 Aug | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 8/7/23 | |
8-11 Aug | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/8/23 | |
8-11 Aug | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 8/8/23 | |
8-11 Aug | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/8/23 | |
9-12 Aug | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/9/23 | |
9-12 Aug | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/9/23 | |
9-13 Aug | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 8/9/23 | |
9-12 Aug | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/9/23 | |
9-11 Aug | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 8/9/23 | |
9-12 Aug | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 8/9/23 | |
9-12 Aug | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 8/9/23 | |
9-10 Aug | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 8/9/23 | |
9-10 Aug | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 8/9/23 | |
9-10 Aug | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 8/9/23 | |
10-15 Aug | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 8/10/23 | |
10-15 Aug | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 8/10/23 | |
13-16 Aug | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/13/23 | |
13-16 Aug | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 8/13/23 | |
14-17 Aug | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/14/23 | |
14-17 Aug | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/14/23 | |
14-18 Aug | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 8/14/23 | |
14-18 Aug | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 8/14/23 | |
14-18 Aug | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 8/14/23 | |
14-17 Aug | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 8/14/23 | |
14-17 Aug | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 8/14/23 | |
14-17 Aug | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 8/14/23 | |
14-17 Aug | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 8/14/23 | |
14-16 Aug | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 8/14/23 | |
14-16 Aug | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 8/14/23 | |
14-16 Aug | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 8/14/23 | |
14-19 Aug | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 8/14/23 | |
14-16 Aug | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 8/14/23 | |
14-16 Aug | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 8/14/23 | |
14-16 Aug | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 8/14/23 | |
14-16 Aug | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 8/14/23 | |
14-16 Aug | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 8/14/23 | |
14-17 Aug | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 8/14/23 | |
14-19 Aug | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 8/14/23 | |
15-16 Aug | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 8/15/23 | |
15-17 Aug | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 8/15/23 | |
17-19 Aug | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 8/17/23 | |
17-18 Aug | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 8/17/23 | |
17-18 Aug | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 8/17/23 | |
18-29 Aug | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 8/18/23 | |
18-22 Aug | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 8/18/23 | |
18-23 Aug | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 8/18/23 | |
18-21 Aug | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 8/18/23 | |
18-23 Aug | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 8/18/23 | |
21-25 Aug | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 8/21/23 | |
21-26 Aug | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 8/21/23 | |
21-26 Aug | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 8/21/23 | |
21-26 Aug | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 8/21/23 | |
21-24 Aug | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/21/23 | |
21-23 Aug | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 8/21/23 | |
21-26 Aug | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 8/21/23 | |
21-24 Aug | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/21/23 | |
21-25 Aug | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 8/21/23 | |
21-25 Aug | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 8/21/23 | |
21-25 Aug | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/21/23 | |
21-24 Aug | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 8/21/23 | |
21-26 Aug | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 8/21/23 | |
21-26 Aug | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 8/21/23 | |
22-25 Aug | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/22/23 | |
22-25 Aug | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/22/23 | |
22-25 Aug | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 8/22/23 | |
22-25 Aug | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 8/22/23 | |
22-25 Aug | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 8/22/23 | |
22-25 Aug | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 8/22/23 | |
22-25 Aug | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 8/22/23 | |
22-25 Aug | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 8/22/23 | |
22-23 Aug | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 8/22/23 | |
22-23 Aug | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 8/22/23 | |
24-28 Aug | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 8/24/23 | |
24-27 Aug | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/24/23 | |
24-27 Aug | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/24/23 | |
24-27 Aug | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/24/23 | |
24-28 Aug | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 8/24/23 | |
24-29 Aug | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 8/24/23 | |
24-25 Aug | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 8/24/23 | |
24-25 Aug | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 8/24/23 | |
25-28 Aug | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 8/25/23 | |
28-31 Aug | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/28/23 | |
28-31 Aug | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 8/28/23 | |
28 Aug-2 Sep | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 8/28/23 | |
28-31 Aug | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/28/23 | |
28-31 Aug | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/28/23 | |
28-31 Aug | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/28/23 | |
28-31 Aug | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/28/23 | |
28-31 Aug | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 8/28/23 | |
28-31 Aug | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/28/23 | |
28-31 Aug | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 8/28/23 | |
28-31 Aug | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 8/28/23 | |
28 Aug-1 Sep | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 8/28/23 | |
28 Aug-1 Sep | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 8/28/23 | |
28 Aug-1 Sep | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 8/28/23 | |
28 Aug-1 Sep | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 8/28/23 | |
28-30 Aug | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 8/28/23 | |
28-30 Aug | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 8/28/23 | |
29-29 Aug | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 8/29/23 | |
3-8 Sep | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 9/3/23 | |
4-7 Sep | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 9/4/23 | |
4-7 Sep | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/4/23 | |
4-6 Sep | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 9/4/23 | |
4-6 Sep | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 9/4/23 | |
4-6 Sep | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 9/4/23 | |
4-9 Sep | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 9/4/23 | |
4-7 Sep | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 9/4/23 | |
4-9 Sep | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 9/4/23 | |
4-9 Sep | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 9/4/23 | |
5-8 Sep | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 9/5/23 | |
5-8 Sep | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 9/5/23 | |
5-8 Sep | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 9/5/23 | |
5-8 Sep | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 9/5/23 | |
5-8 Sep | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 9/5/23 | |
5-6 Sep | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 9/5/23 | |
5-6 Sep | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 9/5/23 | |
6-9 Sep | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/6/23 | |
6-9 Sep | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 9/6/23 | |
6-9 Sep | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 9/6/23 | |
7-10 Sep | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/7/23 | |
7-10 Sep | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/7/23 | |
7-8 Sep | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 9/7/23 | |
7-8 Sep | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 9/7/23 | |
10-15 Sep | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 9/10/23 | |
11-22 Sep | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 9/11/23 | |
11-15 Sep | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 9/11/23 | |
11-15 Sep | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 9/11/23 | |
11-15 Sep | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 9/11/23 | |
11-15 Sep | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 9/11/23 | |
11-16 Sep | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 9/11/23 | |
11-14 Sep | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 9/11/23 | |
11-15 Sep | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 9/11/23 | |
11-15 Sep | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 9/11/23 | |
11-14 Sep | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 9/11/23 | |
11-16 Sep | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 9/11/23 | |
11-16 Sep | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 9/11/23 | |
12-15 Sep | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/12/23 | |
12-15 Sep | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/12/23 | |
12-15 Sep | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 9/12/23 | |
12-16 Sep | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 9/12/23 | |
12-16 Sep | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 9/12/23 | |
12-16 Sep | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 9/12/23 | |
12-15 Sep | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/12/23 | |
12-15 Sep | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 9/12/23 | |
12-15 Sep | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/12/23 | |
12-13 Sep | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 9/12/23 | |
12-14 Sep | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 9/12/23 | |
13-15 Sep | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 9/13/23 | |
13-16 Sep | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/13/23 | |
13-16 Sep | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/13/23 | |
13-13 Sep | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 9/13/23 | |
14-17 Sep | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/14/23 | |
14-16 Sep | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 9/14/23 | |
14-15 Sep | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 9/14/23 | |
14-15 Sep | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 9/14/23 | |
15-18 Sep | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 9/15/23 | |
15-18 Sep | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/15/23 | |
18-22 Sep | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 9/18/23 | |
18-23 Sep | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 9/18/23 | |
18-23 Sep | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 9/18/23 | |
18-23 Sep | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 9/18/23 | |
18 Sep-12 Oct | Ahli K3 Pesawat Angkat Angkut (PAA) - KEMNAKER | 25 Hari | 28.000.000 | Hybrid | Daftar | 9/18/23 | |
18 Sep-4 Oct | Ahli K3 Listrik - KEMNAKER | 17 Hari | 14.500.000 | Hybrid | Daftar | 9/18/23 | |
18-21 Sep | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/18/23 | |
18-21 Sep | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/18/23 | |
18-21 Sep | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/18/23 | |
18-21 Sep | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 9/18/23 | |
19-20 Sep | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 9/19/23 | |
19-20 Sep | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 9/19/23 | |
20-23 Sep | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/20/23 | |
20-24 Sep | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 9/20/23 | |
20-23 Sep | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/20/23 | |
20-23 Sep | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 9/20/23 | |
20-23 Sep | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/20/23 | |
20-23 Sep | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/20/23 | |
20-23 Sep | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/20/23 | |
20-23 Sep | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/20/23 | |
20-23 Sep | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/20/23 | |
20-24 Sep | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 9/20/23 | |
20-24 Sep | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 9/20/23 | |
20-24 Sep | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 9/20/23 | |
20-24 Sep | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 9/20/23 | |
20-25 Sep | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 9/20/23 | |
20-25 Sep | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 9/20/23 | |
20-21 Sep | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 9/20/23 | |
21-24 Sep | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/21/23 | |
21-24 Sep | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 9/21/23 | |
21-24 Sep | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 9/21/23 | |
21-25 Sep | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 9/21/23 | |
21-24 Sep | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 9/21/23 | |
21-24 Sep | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 9/21/23 | |
21-24 Sep | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/21/23 | |
21-25 Sep | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 9/21/23 | |
21-26 Sep | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 9/21/23 | |
21-22 Sep | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 9/21/23 | |
21-22 Sep | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 9/21/23 | |
22-25 Sep | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 9/22/23 | |
22-25 Sep | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 9/22/23 | |
22-25 Sep | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 9/22/23 | |
25-27 Sep | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 9/25/23 | |
25-30 Sep | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 9/25/23 | |
25-27 Sep | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 9/25/23 | |
25-27 Sep | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 9/25/23 | |
25-26 Sep | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 9/25/23 | |
25-25 Sep | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 9/25/23 | |
28-30 Sep | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 9/28/23 | |
28-30 Sep | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 9/28/23 | |
28-30 Sep | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 9/28/23 | |
28-30 Sep | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 9/28/23 | |
28-30 Sep | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 9/28/23 | |
28-30 Sep | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 9/28/23 | |
2-5 Oct | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/2/23 | |
2-5 Oct | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/2/23 | |
2-5 Oct | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/2/23 | |
2-5 Oct | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 10/2/23 | |
2-6 Oct | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 10/2/23 | |
2-6 Oct | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 10/2/23 | |
2-5 Oct | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 10/2/23 | |
3-5 Oct | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 10/3/23 | |
3-5 Oct | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 10/3/23 | |
3-5 Oct | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 10/3/23 | |
5-8 Oct | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/5/23 | |
5-8 Oct | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/5/23 | |
6-11 Oct | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 10/6/23 | |
9-20 Oct | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 10/9/23 | |
9-13 Oct | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 10/9/23 | |
9-13 Oct | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 10/9/23 | |
9-13 Oct | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 10/9/23 | |
9-13 Oct | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 10/9/23 | |
9-12 Oct | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/9/23 | |
9-14 Oct | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 10/9/23 | |
9-12 Oct | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 10/9/23 | |
9-12 Oct | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/9/23 | |
9-12 Oct | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 10/9/23 | |
9-12 Oct | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/9/23 | |
9-12 Oct | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 10/9/23 | |
9-12 Oct | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 10/9/23 | |
9-14 Oct | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 10/9/23 | |
9-14 Oct | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 10/9/23 | |
10-13 Oct | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/10/23 | |
10-13 Oct | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 10/10/23 | |
10-13 Oct | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 10/10/23 | |
10-11 Oct | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 10/10/23 | |
10-12 Oct | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 10/10/23 | |
11-14 Oct | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/11/23 | |
11-15 Oct | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 10/11/23 | |
11-14 Oct | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/11/23 | |
11-14 Oct | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 10/11/23 | |
11-13 Oct | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 10/11/23 | |
12-15 Oct | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/12/23 | |
12-14 Oct | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 10/12/23 | |
12-13 Oct | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 10/12/23 | |
12-13 Oct | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 10/12/23 | |
16-20 Oct | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 10/16/23 | |
16-19 Oct | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/16/23 | |
16-19 Oct | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/16/23 | |
16-21 Oct | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 10/16/23 | |
16-17 Oct | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 10/16/23 | |
17-20 Oct | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 10/17/23 | |
17-20 Oct | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 10/17/23 | |
17-18 Oct | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 10/17/23 | |
17-18 Oct | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 10/17/23 | |
18-19 Oct | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 10/18/23 | |
18-19 Oct | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 10/18/23 | |
19-21 Oct | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 10/19/23 | |
19-23 Oct | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 10/19/23 | |
19-22 Oct | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 10/19/23 | |
19-22 Oct | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 10/19/23 | |
19-22 Oct | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 10/19/23 | |
19-22 Oct | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 10/19/23 | |
19-22 Oct | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 10/19/23 | |
19-21 Oct | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 10/19/23 | |
19-21 Oct | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 10/19/23 | |
19-20 Oct | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 10/19/23 | |
19-20 Oct | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 10/19/23 | |
20-21 Oct | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 10/20/23 | |
20-21 Oct | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 10/20/23 | |
23-28 Oct | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 10/23/23 | |
23-28 Oct | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 10/23/23 | |
23-28 Oct | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 10/23/23 | |
23-26 Oct | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/23/23 | |
23-26 Oct | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 10/23/23 | |
23-25 Oct | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 10/23/23 | |
23-28 Oct | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 10/23/23 | |
23-26 Oct | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 10/23/23 | |
23-26 Oct | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 10/23/23 | |
23-26 Oct | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 10/23/23 | |
23-26 Oct | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 10/23/23 | |
23-25 Oct | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 10/23/23 | |
23-25 Oct | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 10/23/23 | |
23-25 Oct | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 10/23/23 | |
23-28 Oct | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 10/23/23 | |
23-25 Oct | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 10/23/23 | |
23-25 Oct | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 10/23/23 | |
23-26 Oct | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 10/23/23 | |
23-28 Oct | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 10/23/23 | |
23-28 Oct | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 10/23/23 | |
23-28 Oct | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 10/23/23 | |
23-23 Oct | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 10/23/23 | |
24-28 Oct | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 10/24/23 | |
24-28 Oct | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 10/24/23 | |
24-28 Oct | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 10/24/23 | |
24-27 Oct | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/24/23 | |
24-27 Oct | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 10/24/23 | |
24-27 Oct | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/24/23 | |
25-28 Oct | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 10/25/23 | |
25-28 Oct | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 10/25/23 | |
25-28 Oct | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 10/25/23 | |
25-28 Oct | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 10/25/23 | |
25-28 Oct | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/25/23 | |
26-29 Oct | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 10/26/23 | |
26-29 Oct | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/26/23 | |
26-29 Oct | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/26/23 | |
26-29 Oct | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/26/23 | |
26-30 Oct | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 10/26/23 | |
26-31 Oct | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 10/26/23 | |
30 Oct-4 Nov | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 10/30/23 | |
30 Oct-2 Nov | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/30/23 | |
30 Oct-2 Nov | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 10/30/23 | |
30 Oct-2 Nov | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/30/23 | |
30 Oct-2 Nov | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 10/30/23 | |
30 Oct-2 Nov | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 10/30/23 | |
30 Oct-3 Nov | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 10/30/23 | |
30 Oct-3 Nov | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 10/30/23 | |
30 Oct-3 Nov | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 10/30/23 | |
30 Oct-3 Nov | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 10/30/23 | |
30-31 Oct | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 10/30/23 | |
30-30 Oct | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 10/30/23 | |
1-4 Nov | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/1/23 | |
1-4 Nov | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/1/23 | |
1-4 Nov | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/1/23 | |
1-4 Nov | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/1/23 | |
1-4 Nov | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 11/1/23 | |
1-4 Nov | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/1/23 | |
1-3 Nov | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 11/1/23 | |
1-3 Nov | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 11/1/23 | |
1-3 Nov | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 11/1/23 | |
4-9 Nov | Penanggulangan Kebakaran Tingkat A - KEMNAKER | 6 Hari | 8.000.000 | Hybrid | Daftar | 11/4/23 | |
6-9 Nov | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/6/23 | |
6-9 Nov | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/6/23 | |
6-9 Nov | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/6/23 | |
6-9 Nov | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 11/6/23 | |
6-9 Nov | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 11/6/23 | |
6-9 Nov | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 11/6/23 | |
6-10 Nov | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 11/6/23 | |
6-10 Nov | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 11/6/23 | |
6-9 Nov | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 11/6/23 | |
6-9 Nov | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 11/6/23 | |
6-9 Nov | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 11/6/23 | |
6-9 Nov | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 11/6/23 | |
6-9 Nov | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 11/6/23 | |
6-11 Nov | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 11/6/23 | |
8-10 Nov | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 11/8/23 | |
8-11 Nov | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/8/23 | |
8-11 Nov | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/8/23 | |
8-13 Nov | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 11/8/23 | |
12-16 Nov | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 11/12/23 | |
12-16 Nov | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 11/12/23 | |
12-16 Nov | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 11/12/23 | |
12-15 Nov | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/12/23 | |
13-24 Nov | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 11/13/23 | |
13-17 Nov | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/13/23 | |
13 Nov-7 Des | Ahli K3 Pesawat Angkat Angkut (PAA) - KEMNAKER | 25 Hari | 28.000.000 | Hybrid | Daftar | 11/13/23 | |
13-16 Nov | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 11/13/23 | |
13-15 Nov | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 11/13/23 | |
13-15 Nov | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 11/13/23 | |
13-15 Nov | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 11/13/23 | |
13-18 Nov | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 11/13/23 | |
13-16 Nov | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 11/13/23 | |
13-18 Nov | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 11/13/23 | |
13-18 Nov | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 11/13/23 | |
13-18 Nov | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 11/13/23 | |
13-14 Nov | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 11/13/23 | |
14-17 Nov | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/14/23 | |
14-17 Nov | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/14/23 | |
14-17 Nov | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/14/23 | |
14-17 Nov | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/14/23 | |
14-17 Nov | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/14/23 | |
14-17 Nov | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/14/23 | |
14-15 Nov | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 11/14/23 | |
14-16 Nov | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 11/14/23 | |
15-19 Nov | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 11/15/23 | |
15-19 Nov | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 11/15/23 | |
15-19 Nov | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 11/15/23 | |
15-18 Nov | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/15/23 | |
15-18 Nov | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/15/23 | |
15-18 Nov | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/15/23 | |
16-20 Nov | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 11/16/23 | |
16-18 Nov | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 11/16/23 | |
16-18 Nov | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 11/16/23 | |
16-17 Nov | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 11/16/23 | |
16-17 Nov | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 11/16/23 | |
16-18 Nov | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 11/16/23 | |
16-17 Nov | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 11/16/23 | |
16-17 Nov | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 11/16/23 | |
18-20 Nov | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 11/18/23 | |
18-19 Nov | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 11/18/23 | |
18-19 Nov | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 11/18/23 | |
20-24 Nov | Operator Forklift kelas 2 - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 11/20/23 | |
20-25 Nov | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 11/20/23 | |
20-25 Nov | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 11/20/23 | |
20-25 Nov | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 11/20/23 | |
20-23 Nov | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/20/23 | |
20-23 Nov | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/20/23 | |
20 Nov-6 Des | Ahli K3 Listrik - KEMNAKER | 17 Hari | 14.500.000 | Hybrid | Daftar | 11/20/23 | |
20-22 Nov | Penanggulangan Kebakaran Tingkat D - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 11/20/23 | |
20-25 Nov | Penanggulangan Kebakaran Tingkat C - KEMNAKER | 6 Hari | 7.500.000 | Hybrid | Daftar | 11/20/23 | |
20-23 Nov | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 11/20/23 | |
20-23 Nov | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 11/20/23 | |
20-23 Nov | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 11/20/23 | |
20-23 Nov | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/20/23 | |
20-23 Nov | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/20/23 | |
20-22 Nov | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 11/20/23 | |
20-22 Nov | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 11/20/23 | |
21-24 Nov | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/21/23 | |
21-24 Nov | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/21/23 | |
21-24 Nov | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 11/21/23 | |
21-24 Nov | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 11/21/23 | |
21-24 Nov | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 11/21/23 | |
21-24 Nov | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 11/21/23 | |
21-21 Nov | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 11/21/23 | |
21-22 Nov | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 11/21/23 | |
21-22 Nov | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 11/21/23 | |
22-25 Nov | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/22/23 | |
22-26 Nov | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 11/22/23 | |
22-25 Nov | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/22/23 | |
22-25 Nov | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 11/22/23 | |
22-25 Nov | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 11/22/23 | |
22-25 Nov | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 11/22/23 | |
23-26 Nov | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 11/23/23 | |
23-26 Nov | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 11/23/23 | |
23-26 Nov | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 11/23/23 | |
23-26 Nov | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 11/23/23 | |
23-26 Nov | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 11/23/23 | |
23-26 Nov | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/23/23 | |
23-26 Nov | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/23/23 | |
23-26 Nov | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/23/23 | |
23-27 Nov | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 11/23/23 | |
23-28 Nov | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 11/23/23 | |
23-24 Nov | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 11/23/23 | |
23-24 Nov | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 11/23/23 | |
24-29 Nov | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 11/24/23 | |
24-27 Nov | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 11/24/23 | |
24-27 Nov | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 11/24/23 | |
24-29 Nov | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 11/24/23 | |
27-30 Nov | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/27/23 | |
27 Nov-2 Des | Penanggulangan Kebakaran Tingkat B - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 11/27/23 | |
27-30 Nov | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 11/27/23 | |
27 Nov-1 Des | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 11/27/23 | |
27 Nov-1 Des | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 11/27/23 | |
27 Nov-1 Des | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 11/27/23 | |
27 Nov-1 Des | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 11/27/23 | |
27-30 Nov | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 11/27/23 | |
27-28 Nov | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 11/27/23 | |
27-27 Nov | Basic Sea Survival | 1 Hari | 2.500.000 | Online | Daftar | 11/27/23 | |
30 Nov-3 Des | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/30/23 | |
30 Nov-3 Des | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 11/30/23 | |
1-4 Des | Petugas K3 Ruang Terbatas Utama - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 12/1/23 | |
1-4 Des | Pengoperasian Instalasi Pengelolaan Sampah /Limbah Padat Non B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 12/1/23 | |
1-4 Des | pengawasan Pengelolaan Sampah/Limbah Non B3 - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 12/1/23 | |
4-15 Des | Ahli K3 Umum - KEMNAKER | 12 Hari | 5.000.000 | Online | Daftar | 12/4/23 | |
4-8 Des | Auditor SMK3 - KEMNAKER | 5 Hari | 4.500.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Operator Manlift - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/4/23 | |
4-7 Des | Operator Mobile Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/4/23 | |
4-7 Des | Operator Tower Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/4/23 | |
4-7 Des | Operator Overhead Crane kelas I - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/4/23 | |
4-9 Des | Teknisi K3 Listrik - KEMNAKER | 6 Hari | 6.500.000 | Hybrid | Daftar | 12/4/23 | |
4-7 Des | Ahli Muda K3 Konstruksi - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 12/4/23 | |
4-7 Des | Train of Trainer (TOT) Level 3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/4/23 | |
4-7 Des | K3 Laboratorium - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/4/23 | |
4-6 Des | Welder / Juru Las SMAW 1G - 2G - BNSP | 3 Hari | 7.000.000 | Blended | Daftar | 12/4/23 | |
4-6 Des | Welder / Juru Las SMAW 3G - 4G | 3 Hari | 7.250.000 | Online | Daftar | 12/4/23 | |
4-6 Des | Welder / Juru Las SMAW 5G - 6G - BNSP | 3 Hari | 7.750.000 | Blended | Daftar | 12/4/23 | |
4-9 Des | Welding Inspektor - BNSP | 6 Hari | 10.000.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Diklat Uji POP (Pengawas Operasional Pertama) - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Diklat dan Uji POM (Pengawas Operasional Madya) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Pengemudi angkutan barang umum - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Pengemudi angkutan barang berat - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Pengemudi angkutan barang kontainer - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Pengemudi angkutan barang khusus - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Pengemudi angkutan B3 - BNSP | 4 Hari | 8.000.000 | Online | Daftar | 12/4/23 | |
4-7 Des | Contractor's Safety Management System (CSMS) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 12/4/23 | |
4-7 Des | HAZOPS | 4 Hari | 6.000.000 | Online | Daftar | 12/4/23 | |
4-9 Des | Inspektur Kelistrikan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 12/4/23 | |
4-9 Des | Inspektur Genset - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 12/4/23 | |
4-5 Des | Defensive Driving Training (DDT) - Light Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 12/4/23 | |
4-5 Des | Safety Riding Training (DDT) - Motorbike | 2 Hari | 1.500.000 | Online | Daftar | 12/4/23 | |
5-7 Des | Petugas P3K (First Aid) - KEMNAKER | 3 Hari | 4.500.000 | Hybrid | Daftar | 12/5/23 | |
5-8 Des | Operator Scaffolding - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/5/23 | |
5-8 Des | Pengawas Scaffolding - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/5/23 | |
5-9 Des | Manager Hubungan Industri - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 12/5/23 | |
5-9 Des | Manajer SDM (HR Manager) - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 12/5/23 | |
5-9 Des | General Manager SDM - BNSP | 5 Hari | 11.000.000 | Online | Daftar | 12/5/23 | |
5-8 Des | Penata pembuatan perjanjian kerja - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/5/23 | |
5-8 Des | Penata penyusunan renumerasi - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/5/23 | |
5-8 Des | Penata kelembagaan hubungan industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/5/23 | |
6-8 Des | Petugas P3K (First Aid) - BNSP | 3 Hari | 4.000.000 | Hybrid | Daftar | 12/6/23 | |
6-9 Des | Operator Blasting & Coating - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Operator Lantai Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Operator Menara Bor - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Juru Bor - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Ahli Pengendali Bor - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Kepala Bagian SDM - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Kepala Bagian Hubungan Industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Kepala Bagian Pelatihan & Pengembangan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Kepala Bagian Renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Auditor peningkatan kinerja dan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Konsultan produktivitas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Pembina peningkatan produktivitas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/6/23 | |
6-9 Des | Warehouse supervisor - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/6/23 | |
6-11 Des | Inspektur Coating - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 12/6/23 | |
6-7 Des | Defensive Driving Training (DDT) - Heavy Vehicle | 2 Hari | 2.500.000 | Online | Daftar | 12/6/23 | |
6-7 Des | Tools Inspector | 2 Hari | 3.500.000 | Online | Daftar | 12/6/23 | |
7-8 Des | ISO 9001:2015 Sistem Manajemen Mutu | 2 Hari | 3.500.000 | Online | Daftar | 12/7/23 | |
7-9 Des | Integrated Management System (IMS) ISO 9001-ISO 14001-ISO 45001 | 3 Hari | 4.200.000 | Online | Daftar | 12/7/23 | |
9-11 Des | Emergency Response Plan (ERP) | 3 Hari | 4.500.000 | Online | Daftar | 12/9/23 | |
9-10 Des | ISO 45005:2020 Manajemen K3 paska COVID | 2 Hari | 3.500.000 | Online | Daftar | 12/9/23 | |
9-10 Des | ISO/IEC 17025:2007 Sistem Laboratorium | 2 Hari | 3.250.000 | Online | Daftar | 12/9/23 | |
11-14 Des | Operator Forklift kelas 1 - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/11/23 | |
11-14 Des | Operator Forklift Telescofic (Manitou) - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/11/23 | |
11-15 Des | Operator Mobile Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 12/11/23 | |
11-15 Des | Operator Tower Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 12/11/23 | |
11-15 Des | Operator Overhead Crane kelas II - KEMNAKER | 5 Hari | 4.250.000 | Hybrid | Daftar | 12/11/23 | |
11-14 Des | Rigger / Juru Ikat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/11/23 | |
11-14 Des | Operator Alat Berat - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/11/23 | |
11-14 Des | Auditor SMK3 - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Investigasi Kecelakaan - BNSP | 4 Hari | 6.000.000 | Offline | Daftar | 12/11/23 | |
11-14 Des | Penilaian Risiko K3 (IBPR / HIRA) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | K3 di Rumah Sakit - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Teknisi K3 Bekerja di Ketinggian - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Pengawasa K3 Bekerja di Ketinggian - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Operator K3 Listrik - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/11/23 | |
11-15 Des | Teknisi K3 Listrik - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 12/11/23 | |
11-16 Des | Ahli K3 Listrik - BNSP | 6 Hari | 7.500.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Operator K3 Industri Migas - BNSP | 4 Hari | 3.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Pengawas K3 Industri Migas - BNSP | 4 Hari | 3.500.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Pengawas Utama K3 Industri Migas - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Operator Lantai Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Operator Menara Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Operator Unit Perawatan Sumur - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Ahli Pengendali Perawatan Sumur - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Supervisor Sumber Daya Manusia - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Supervisor Hubungan Industrial - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Petugas Administrasi Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Petugas Pembimbing Kepesertaan Program Jaminan Sosial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Penata Penyelesaian Perselisihan Hubungan Industrial - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Analisis renumerasi - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Analis pencegahan dan penyelesaian perselisihan hubungan industrial - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Promotor produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Penyuluh produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Pengukur produktivitas - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/11/23 | |
11-15 Des | Ahli produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 12/11/23 | |
11-15 Des | Spesialis produktivitas - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 12/11/23 | |
11-13 Des | Warehouse operator | 3 Hari | 4.500.000 | Online | Daftar | 12/11/23 | |
11-13 Des | Logistik administration officer - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Freight forwarder - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 12/11/23 | |
11-14 Des | Supply chain manager - BNSP | 4 Hari | 7.500.000 | Online | Daftar | 12/11/23 | |
11-16 Des | Safety Man | 6 Hari | 3.000.000 | Online | Daftar | 12/11/23 | |
12-15 Des | Ahli K3 Umum - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Ahli K3 Madya (Teknisi K3 Umum) - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Ahli K3 Muda (Operator K3 Umum) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Penguji K3 (Inspeksi K3) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Pengambilan Contoh Uji Air (PCUA) - BNSP | 4 Hari | 6.500.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Penanggung Jawab Operasional Pengelolaan Air Limbah (POPAL) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Penanggung Jawab Pengendalian Pencemaran Air (PPPA) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Operatoer Wheel Excavator | 4 Hari | 4.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Operator Heavy Dump Truck - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Operator Mesin Bubut (Membubut Dasar) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Operator Mesin NC / CNC - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Pipe Fitter - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Teknisi K3 Bekerja di Ruang Terbatas - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Ahli Muda Ruang Terbatas - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/12/23 | |
12-15 Des | Ahli Madya Ruang Terbatas - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/12/23 | |
12-12 Des | K3 Bekerja di Dekat Air (Near Water) | 1 Hari | 1.500.000 | Online | Daftar | 12/12/23 | |
13-16 Des | Teknisi Scaffolding - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/13/23 | |
13-17 Des | Supervisor Scaffolding - KEMNAKER | 5 Hari | 5.000.000 | Hybrid | Daftar | 12/13/23 | |
13-14 Des | Basic Safety Training | 2 Hari | 2.750.000 | Online | Daftar | 12/13/23 | |
14-18 Des | Train of Trainer (TOT) Level 4 - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 12/14/23 | |
14-17 Des | Pengoperasian Instalasi Pengelolaan Limbah B3 - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 12/14/23 | |
14-17 Des | Pemantauan dan Analisis Pengelolaan Limbah B3 (PLB3) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 12/14/23 | |
14-17 Des | Penanggung Jawab Operasional Instalasi Pengendalian Pencemaran Udara (POIPPU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 12/14/23 | |
14-17 Des | penanggung Jawab Pengendalian Pencemaran Udara (PPPU) - BNSP | 4 Hari | 9.000.000 | Online | Daftar | 12/14/23 | |
14-17 Des | Manager Energi - BNSP | 4 Hari | 13.000.000 | Online | Daftar | 12/14/23 | |
14-15 Des | ISO 31000:2018 Sistem Manajemen Risiko | 2 Hari | 3.500.000 | Online | Daftar | 12/14/23 | |
14-15 Des | ISO 45001:2018 Sistim Manajemen K3 | 2 Hari | 3.500.000 | Online | Daftar | 12/14/23 | |
16-17 Des | ISO 37001:2016 Anti Briberry Management System | 2 Hari | 3.500.000 | Online | Daftar | 12/16/23 | |
16-17 Des | ISO 28000:2007 Sistem Manajemen Keamanan Rantai Pasok | 2 Hari | 3.500.000 | Online | Daftar | 12/16/23 | |
18-23 Des | Operator Mobile Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 12/18/23 | |
18-23 Des | Operator Tower Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 12/18/23 | |
18-23 Des | Operator Overhead Crane kelas III - KEMNAKER | 6 Hari | 4.500.000 | Hybrid | Daftar | 12/18/23 | |
18-21 Des | Operator Gondola - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/18/23 | |
18-21 Des | Operator Conveyor - KEMNAKER | 4 Hari | 4.000.000 | Hybrid | Daftar | 12/18/23 | |
18-21 Des | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 2 - KEMNAKER | 4 Hari | 5.000.000 | Hybrid | Daftar | 12/18/23 | |
18-21 Des | Tenaga Kerja Bangunan Tiggi (TKBT) Tingkat 1 - KEMNAKER | 4 Hari | 6.500.000 | Hybrid | Daftar | 12/18/23 | |
18-21 Des | Petugas K3 Ruang Terbatas Madya - KEMNAKER | 4 Hari | 6.000.000 | Hybrid | Daftar | 12/18/23 | |
18-21 Des | Juru Ikat beban (Rigger) - BNSP | 4 Hari | 3.750.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Operator Forklift - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Operator Overhead Crane (OHC) - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Operator Mobile Crane 35 Ton - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Operator Mobile Crane 70 Ton - BNSP | 4 Hari | 4.250.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Operator Mobile Crane >70 Ton - BNSP | 4 Hari | 4.500.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Diklat dan Uji POU (Pengawas operasional Utama) - BNSP | 4 Hari | 8.500.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Ahli Madya Keselamatan Pertambangan - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/18/23 | |
18-21 Des | Ahli Muda Keselamatan Pertambangan - BNSP | 4 Hari | 4.000.000 | Online | Daftar | 12/18/23 | |
18-22 Des | Ahli Utama Keselamatan Pertambangan - BNSP | 5 Hari | 6.000.000 | Online | Daftar | 12/18/23 | |
18-22 Des | Auditor hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 12/18/23 | |
18-22 Des | Konsultan hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 12/18/23 | |
18-22 Des | Ahli hubungan industrial - BNSP | 5 Hari | 7.500.000 | Online | Daftar | 12/18/23 | |
18-23 Des | Inspektur Bejana Tekan - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 12/18/23 | |
18-23 Des | Inspektur Pesawat Angkat - BNSP | 6 Hari | 12.000.000 | Online | Daftar | 12/18/23 | |
18-19 Des | Dasar - Dasar K3 Lingkungan Pertambangan | 2 Hari | 1.750.000 | Online | Daftar | 12/18/23 | |
19-22 Des | Ahli Madya Higiene Industri (HIMA) - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/19/23 | |
19-22 Des | Ahli Muda Higiene Industri (HIMU) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/19/23 | |
19-22 Des | Ahli Utama Higiene Industri (HIU) - BNSP | 4 Hari | 7.000.000 | Online | Daftar | 12/19/23 | |
20-23 Des | Pengelolaan Higiene Sanitasi Makanan - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/20/23 | |
20-23 Des | Pengelolaan Keamanan Pangan Berbasis HACCP - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/20/23 | |
20-23 Des | Penjamah Makanan (Food Handler) - BNSP | 4 Hari | 5.000.000 | Online | Daftar | 12/20/23 | |
20-23 Des | Pemilah Sampah - BNSP | 4 Hari | 5.500.000 | Online | Daftar | 12/20/23 | |
20-23 Des | Pengawasan Pemilah Sampah - BNSP | 4 Hari | 6.000.000 | Online | Daftar | 12/20/23 | |
21-23 Des | Petugas Penanganan Bahaya H2S - BNSP | 3 Hari | 5.000.000 | Online | Daftar | 12/21/23 | |
21-23 Des | Authorized Gas Tester (AGT) - BNSP | 3 Hari | 4.500.000 | Online | Daftar | 12/21/23 | |
21-23 Des | Staff SDM (HR Officer) - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 12/21/23 | |
21-23 Des | Staff Rekrutmen dan Seleksi SDM - BNSP | 3 Hari | 8.900.000 | Online | Daftar | 12/21/23 | |
21-23 Des | Staff Sistem Informasi Pekerja - BNSP | 3 Hari | 3.750.000 | Online | Daftar | 12/21/23 | |